Check before you commit time
- Break the scope into routine, seasonal, reactive and specialist work rather than treating every landscaping keyword as equivalent.
- Check whether site geography, access windows, plant, subcontracting and response expectations can be evidenced realistically.
- Map requested inspection, environmental and reporting outputs to existing records before drafting a method.
- Treat an unclear lot boundary or missing commercial document as a clarification point, not an assumption.